What a plant actually puts on the wall
- Output against target for the line or the cell, refreshed from the system that already holds it
- OEE broken into availability, performance and quality, so a bad hour is attributable
- Downtime and the reason code, which is the number that starts the conversation at handover
- Scrap and first pass yield, per line rather than per plant, because the plant average hides the problem
- Days since the last recordable incident, and the current hazard or lockout in force
- Shift handover: who is on, what changed, what is still open from the previous crew
- Plant notices that never reach the floor by email, because most of the floor has no email
The screens that get read are the ones showing a number that moved since yesterday. A board that shows the same quarterly poster for six weeks becomes wallpaper, which is the usual reason a first attempt at floor screens gets abandoned.